Atlas report · Power · Los Angeles County

How Los Angeles Gets Its Power: LADWP, SCE and the Grid

LADWP powers about 1.59 million customers in the City of LA; SCE serves most of the county. How the grid works, the 2025 power mix, costs and LA100.

Transmission towers carrying power away from Hoover Dam
Photo: Dietmar Rabich · CC BY-SA 4.0

From the SOS Atlas. Research as of 30 October 2026, from public sources; every figure links to its source.

Lead. Most of LA County gets its power from two very different utilities. The City of Los Angeles owns its own, the Los Angeles Department of Water and Power (LADWP), with about 1.59 million customers (KBRA, May 2026). Most of the rest of the county is served by Southern California Edison (SCE), an investor-owned utility whose territory covers about 50,000 square miles (Edison International 10-K, FY2025). LADWP's all-time peak is still 6,502 MW, set on 31 August 2017. It delivered 22,974 GWh in FY2024-25 and brought in $5.5 billion in power revenue (LADWP LA100 Advisory Group deck, Aug 2026). In late November 2025 the city stopped taking coal power from Utah's Intermountain plant, and LADWP says its supply passed 60% clean energy that year (LADWP, 4 Dec 2025). Two numbers frame what comes next. LADWP plans a $20.4 billion Power System capital program through 2031, two-thirds of it borrowed (KBRA, May 2026). And January 2025 brought the two wind-driven fires that now dominate both utilities' risk disclosures.

How it works in LA: from fuel to your outlet

Follow the electricity backwards from a light switch in Los Angeles.

1. The outlet and the neighbourhood grid. Inside the City of LA, power reaches homes over LADWP's distribution system. That system has about 7,380 miles of overhead lines and 3,883 miles of underground cable (LADWP Briefing Book 2024-25), carried on 296,796 poles (LADWP 2025-26 Power Infrastructure Plan). In Burbank the local distributor is Burbank Water and Power, and in Glendale, Pasadena, Vernon and other municipal-utility cities it is the city utility. Almost everywhere else in the county it is SCE.

2. High-voltage transmission. LADWP's transmission network runs 4,081 miles of overhead AC and DC circuits across five Western states, plus 136 miles underground (Briefing Book 2024-25). LADWP's 2017 resource plan says the grid was designed around imports from the north and east (LADWP 2017 IRP). The biggest import line we could document is the Southern Transmission System. It is a high-voltage DC link rated at 2,400 MW that runs from the Intermountain site near Delta, Utah, to Southern California (Intermountain Power Agency). The Pacific DC Intertie from the Northwest is also commonly named as an LA import path, but no source we opened documents it (see "What we couldn't find (yet)" below).

3. Power plants and contracts. LADWP's Briefing Book lists five thermal plants, 14 small hydro plants, one large pumped-storage plant, one wind plant and two solar PV plants that it operates. Its net dependable capacity is 8,081 MW (Briefing Book 2024-25), and its net maximum plant capacity was 11,525 MW in FY2024-25 (LA100 deck, Aug 2026). The fleet sorts into three groups:

  • In the basin (LA County): four natural-gas plants, Haynes, Scattergood, Valley and Harbor, plus the Castaic pumped-storage plant. LADWP reports 1,265 MW of pumped hydro storage (Briefing Book). Scattergood is being modernized with a 346 MW combined-cycle replacement.
  • Out of the basin, owned or shared: the Intermountain Power Project (IPP) in Utah, a share of the Palo Verde nuclear plant in Arizona, Hoover Dam hydro, the Apex gas plant, and Owens Gorge and other Eastern Sierra small hydro (Briefing Book).
  • Contracted renewables and storage: the Eland Solar & Storage Center, rated up to 400 MW of solar with 1,200 MWh of storage, which LADWP expected to supply about 7% of LA's energy once fully online in 2025 (Briefing Book). Newer solar contracts secured for 2025-26 add Milford Solar (235 MW), Utah Solar (300 MW) and Notch Peak Solar (299 MW) (LA100 deck).

4. The fuel. The 2025 Power Content Label, filed with the California Energy Commission, breaks LADWP's retail supply down as follows (LADWP 2025 PCL):

SourceShare
Eligible renewables (total)45%
Solar19%
Wind14%
Geothermal9%
Eligible hydro2%
Natural gas26%
Nuclear15%
Coal and petroleum12%
Large hydro3%
Unspecified0%

Share by source

  • Solar19%
  • Wind14%
  • Geothermal9%
  • Eligible hydro2%
  • Natural gas26%
  • Nuclear15%
  • Coal and petroleum12%
  • Large hydro3%
  • Unspecified0%
Source: LADWP 2025 PCL. Drawn from the table above.

Coal still appears on the 2025 label because IPP coal units supplied LA until late November 2025.

5. Balancing. LADWP operates its own balancing authority, so it matches supply and demand on its system itself instead of through the California ISO (CAISO), which balances SCE's grid. Officials describe both arrangements in general terms; we found no published source that confirms either. Burbank Water and Power lists LADWP as a "system resource" in its budget (BWP, Mar 2025), but the document does not say what that service is.

Who runs it

RoleWhoNotes
City utility (owner-operator)LADWP, a department of the City of Los AngelesThe Board of Water and Power Commissioners approves rates and budgets. In June 2025 it approved a 0.58% base-rate revenue target increase for FY2025-26 (KBRA, Sept 2025).
Investor-owned utilitySCE, owned by Edison InternationalRegulated by the CPUC. Some transmission costs are recovered through FERC rates (EIX 10-K).
Municipal utilities in LA CountyBurbank Water and Power; also Glendale Water & Power, Pasadena Water and Power, Vernon and othersWe opened only Burbank's documents for this report. The others are listed under "What we couldn't find (yet)".
Out-of-state generation ownerIntermountain Power Agency (Utah)Owns IPP. LADWP is the largest purchaser and serves as Operating Agent and Project Manager (IPA).
Joint public-power agencySouthern California Public Power Authority (SCPPA)Runs a storage RFP that LADWP cites (LA100 deck).
State energy agencyCalifornia Energy CommissionPublishes each utility's Power Content Label (CEC 2024 LADWP label).
Wildfire safety oversightCPUC and the Office of Energy Infrastructure SafetyOversee SCE's PSPS program (CPUC letter, 3 Oct 2025).
Grid operatorCAISOBalancing authority for SCE (described in general terms; we found no published source confirming it; see above).
CreditKBRARates LADWP Power System revenue bonds AA, Stable (KBRA, May 2026).

The numbers

LADWP

  • Customers: about 1.59 million in May 2026 (KBRA). The Briefing Book gives more than 1.6 million service customers in FY2023-24, including about 6,000 in the Owens Valley (Briefing Book). LADWP serves about 4 million people (Infrastructure Plan 2025-26) across 465 square miles (LADWP facts page).
  • Who uses the power: in 2025, residential customers bought about 34% of sales, commercial and industrial customers 61%, and others 5% (KBRA, May 2026).
  • Peak demand: the record is 6,502 MW on 31 August 2017, and the next highest is 6,430 MW the following day (2017 IRP). Earlier records were 5,123 MW (October 1991) and 5,709 MW (autumn 2008) (LADWP News). LADWP's August 2026 deck still cites the 2017 figure as the record.
  • Energy: more than 20,749 GWh supplied in FY2023-24 (Briefing Book) and 22,974 GWh in FY2024-25 (LA100 deck).
  • Renewable share on the official label: 32% (2018), 34% (2019), 35.6% (2022), 39.5% (2023), 41% (2024) and 45% (2025). Over the same years coal fell from 18% to 12%, after a low of 10.3% in 2023 (2018, 2019, 2022, 2023, 2024, 2025).
  • Carbon intensity: 567 lbs CO2e/MWh in 2022, 499 in 2023, 505 in 2024 and 487 in 2025. That is still above the California utility average of 384 in 2025 (2025 label). One reason is that LADWP buys almost no "unspecified" market power, which made up 21% of the statewide average mix.
  • Storage: 1,265 MW of pumped hydro, 21.5 MW of utility-scale batteries, and 49 MW of customer batteries installed as of June 2025 (Briefing Book). Eland adds 1,200 MWh.
  • Local solar: 913 MW reached by August 2026, against a goal of more than 1,600 MW by 2035 (LA100 deck).

SCE

  • Peak demand: 21,248 MW in 2025, down from 23,861 MW in 2024 (Edison International annual report FY2025).
  • Deliveries: 78,612 GWh in 2025, down from 81,841 GWh in 2024 (same source).
  • Carbon-free share: about 61% of 2025 deliveries, a preliminary figure (EIX 10-K).
  • Customers: the total customer-account count, and the number of SCE customers inside LA County, were not found in the documents we opened.

Burbank Water and Power

  • All-time system peak of 322 MW, and a 2024 summer peak of 311 MW (BWP budget presentation, 6 Mar 2025).
  • Its resources include the Magnolia Power Project (estimated 1.52 million MWh in FY2025-26), Tieton Hydro (about 45,471 MWh a year) and the repowered IPP.
  • Renewables are shown at roughly 48% to 51% of supply.

California, for context

In 2024 the state sold 245.7 million MWh at retail. The all-sector average price was 27.04 cents/kWh, the second-highest of any state, against 96,773 MW of net summer capacity (EIA California profile, 2024).

Money

LADWP budgets.

  • FY2024-25: the approved power budget was $5.8 billion. That split into $1.8 billion for operations and maintenance, $2.4 billion for capital and $1.6 billion for fuel and purchased power (Briefing Book). In FY2019-20 the budget was $4.7 billion (facts page).
  • FY2026-27: the preliminary Power Revenue Fund budget is $8.20 billion. The Power System Reliability Program accounts for $2.43 billion of it, up from $1.87 billion in FY2025-26 (LADWP preliminary budget transmittal, 13 Feb 2026; Infrastructure Plan).

Money flowing to City Hall. Two separate streams reach the city's general budget:

  • The Power Revenue Transfer, estimated at $214.2 million to $220.0 million.
  • The Electricity Users' Tax collected on bills, estimated at $554.2 million to $573.6 million for FY2026-27 (budget transmittal).

Debt and credit.

  • LADWP's Power System revenue bonds are rated AA, Stable by KBRA. KBRA gave that rating to the 2025 Series C bonds in September 2025 and to the 2026 Series B bonds in May 2026.
  • Parity bonds outstanding rose from about $11.99 billion (August 2025) to $13.19 billion (May 2026).
  • Off-balance-sheet take-or-pay obligations to joint powers agencies rose from $3.43 billion to $3.96 billion over the same period.
  • Debt service coverage was 2.72x in FY2024 and 2.98x in FY2025. The Board's target is 1.70x.
  • Liquidity was $1.86 billion, or 201 days of cash, at 30 June 2025 (KBRA 2025; KBRA 2026).
  • Moody's, S&P and Fitch ratings for the LADWP Power System were not verified for this report.

Capital plan. In September 2025 KBRA described an $18.5 billion Power System capital program for FY2026-2030, with about $11.9 billion of new debt. By May 2026 that had grown to $20.4 billion through 2031, with $14.1 billion of debt (KBRA).

Rates.

  • KBRA put LADWP's retail rate at 28.6 cents/kWh in December 2024. This is a system average, not the residential rate. KBRA projected 30 to 42 cents by 2030, depending on how aggressive the renewable targets are (KBRA 2025).
  • LADWP's own LA100 modelling shows projected average retail rates of 44.1 cents in 2030, 64.2 cents in 2035 and 71.1 cents in 2045 on the LA100 path. The slower SB 100 benchmark path comes out at 38.0, 45.5 and 51.9 cents (LA100 deck).
  • LADWP prices the LA100 path at about $102.5 billion in net present value (2024-45), against $84.8 billion for SB 100. It attributes most of the $17.7 billion gap to in-basin hydrogen.
  • KBRA summarizes the May 2026 LA100 Plan as costing more than $80 billion in NPV (2022-2045), with average annual rate impacts of 7.7% to 8.3% (KBRA 2026). The two sets of cost figures use different periods and are not directly comparable.
  • An actual residential cents/kWh tariff figure was not found in the sources opened.

SCE.

  • Capital spending was $6.7 billion in 2025. The base forecast is $40.6 billion for 2026-2030, rising from $7.3 billion in 2026 to $9.1 billion in 2030. Of that, $4.6 billion is wildfire mitigation.
  • Rate base was $48.2 billion at the end of 2025 and is forecast to reach $67.9 billion in 2030 (EIX 10-K).
  • SCE's ratings as of February 2026 were Moody's Baa1 (Stable), Fitch BBB (Stable) and S&P BBB- (Negative, after a downgrade).
  • SCE says it expects its system average rate to rise at or below inflation through 2030 (EIX annual report).

Burbank. The proposed electric fund budget is $419.4 million for FY2025-26 and $346.1 million for FY2026-27, against $331.8 million adopted for FY2024-25. Average electric rate increases of 9.9% were proposed for January 2026 and again for January 2027 (BWP).

Who pays. Customers pay for both utilities' systems through their rates. For LADWP, the city also takes the transfer and the users' tax off the top. For SCE, wildfire costs are shared between shareholders, customers and the state Wildfire Fund (see below).

Where electricity depends on other lifelines

These dependencies are described the way utility plans describe them. Where a link is described only in general terms, we say so: officials describe it, but we found no published figure.

  • Natural gas → power. In 2025, 26% of LADWP's supply came from natural gas (2025 label). The four in-basin plants (Haynes, Scattergood, Valley, Harbor) are gas-fired, and the new IPP units also run on gas for now. The power documents we opened do not name the in-basin plants' pipeline supplier. The link to SoCalGas is one officials describe in general terms; we found no published figure. This ties the city's power plants to the gas system. LADWP calls Scattergood's modernization critical for local reliability (LA100 deck).
  • Water → power. Hydro serves LA three ways: large hydro (3%), eligible small hydro (2%), and Castaic pumped storage, which moves water between reservoirs. Castaic sits on State Water Project facilities, which ties it to the state Department of Water Resources (DWR). The 14 small hydro plants are tied to the LA Aqueduct, so drought years cut both water and power. For both links, officials describe this in general terms; we found no published figure. LADWP's coastal gas plants also use seawater for cooling, but the current plan for that was not covered in the sources we opened.
  • Power → water. LADWP's Water System, MWD pumping and treatment all run on electricity. Officials describe this in general terms; we found no published figure. The water report looks at it from the water side.
  • Transmission from other states. LADWP's own plan says the grid was built around imports from the north and east (2017 IRP). Several pieces of LA's supply depend on interstate lines: IPP in Utah, reached over the 2,400 MW Southern Transmission System; Palo Verde in Arizona and Hoover on the Colorado River; Apex in Nevada; and the new Utah solar contracts. Planned upgrades named in LADWP's plans include McCullough-Victorville, Adelanto-Rinaldi and Lugo-Victorville. These sit among more than 40 transmission and distribution projects worth about $5.4 billion (LA100 deck; Infrastructure Plan). No published figure for LADWP's import share was found.
  • Hydrogen. IPP Renewed is designed to blend up to 30% green hydrogen, with blending planned from 2026. The hydrogen is made by renewable-powered electrolysis and stored in salt caverns beneath the Utah site (LADWP IPP page; IPA).
  • Power → everything else. Hospitals, water, telecoms, fuel pumps and traffic signals all depend on the grid. SCE's January 2025 shutoffs alone de-energized 10,174 critical facilities (CPUC).

Reliability and history

Day-to-day reliability (LADWP).

  • In 2023 the average customer was without power for 198 minutes (SAIDI), or 141 minutes if major event days are excluded. The average customer saw 0.76 outages (SAIFI), and the average outage lasted 261 minutes (CAIDI).
  • FY2024-25 targets, excluding major events, were SAIDI of 115 minutes or less, SAIFI of 0.72 or fewer and CAIDI of 160 minutes or less (Briefing Book).
  • For 2024, LADWP reports SAIDI just under two hours, fewer than one outage per customer and no major event days (Infrastructure Plan).
  • Poles are being replaced faster: 2,743 in FY2024-25, against a goal of 4,000 in FY2025-26.

September 2024 heat storm. Days of triple-digit heat overloaded neighbourhood equipment in LADWP's distribution system.

  • By 6 pm on 8 September, LADWP had restored 92,912 customers and 15,208 were still out. The worst-hit areas were Harvard Park, Hollywood and Northridge. A distribution station overload forced rotating outages in parts of Watts and Green Meadows (LADWP, 8 Sept 2024).
  • By 4 pm on 9 September, 115,332 had been restored and 6,384 were still out (LADWP, 9 Sept 2024).
  • By the evening of 10 September, LADWP reported 130,648 restored and 6,018 still out. SCE had 3,087 customers out across its five-county area (ABC7, 11 Sept 2024).
  • This was a local distribution event, not a shortage of supply. LADWP did not set a new peak record that week.

January 2025 fires and shutoffs.

  • Eaton Fire. It started on 7 January 2025 near Altadena during an extreme Santa Ana windstorm. It burned 14,021 acres, destroyed 9,419 structures, damaged 1,076 and killed 19 civilians, and CAL FIRE lists its cause as "Electrical" (CAL FIRE, updated 6 Aug 2026). The County-commissioned McChrystal review (Sept 2025) counts 9,414 destroyed and 1,074 damaged (McChrystal review). The County's total of 31 deaths across both January fires matches CAL FIRE's 19 for Eaton plus LAFD's 12 for Palisades. SCE says it has not conclusively determined the cause. It says a de-energized, idle transmission facility in the preliminary origin area is a viable explanation, and that its equipment likely could have been associated with the ignition. By 31 December 2025 SCE had recorded $1.1 billion of settlement losses. It expects most of that to be recovered from customer-funded self-insurance, the Wildfire Fund and FERC rates, and it warns more material losses are probable. A bellwether trial is set for January 2027 (EIX 10-K).
  • SCE Public Safety Power Shutoffs. In its two January 2025 events, SCE cut power to 515,589 customers, the largest shutoff in its history. The longest outage lasted 15 days. SCE ran 20 PSPS events in 2024, more than all other California utilities combined (14). The CPUC told SCE to show measurable improvements in the scope, length and notification of its shutoffs (CPUC, 3 Oct 2025). SCE counted 12 events in 2020, 8 in 2023, 20 in 2024 and 14 in 2025 (SCE 2026 PSPS Action Plan).
  • Palisades Fire (LADWP territory). KBRA reports that a multi-agency investigation concluded the Palisades Fire was a holdover of the 1 January 2025 "Lachman Fire", and that an ATF affidavit ruled out power lines as a potential cause of the Lachman Fire. Several hundred lawsuits are still pending against LADWP. Plaintiffs allege, among other things, that it failed to de-energize lines after poles broke. KBRA says LADWP's exposure cannot yet be estimated (KBRA, May 2026). LADWP's early Power System recovery cost estimate for the 2025 wildfires was about $85 million, plus $8 million for windstorm damage, and it expects FEMA and Cal OES to reimburse most of it. It has also bought a $100 million wildfire catastrophe bond covering August 2025 to September 2028 (KBRA, Sept 2025).

Wildfire money at the state level. The Wildfire Fund created by AB 1054 (2019) reported more than $21 billion of claims-paying capacity on 30 September 2025. SB 254, signed in September 2025, created a Continuation Account (EIX 10-K).

What's changing, 2026 to 2030

  1. Coal is gone, gas is the bridge. LADWP stopped receiving coal power from IPP in late November 2025, about nine years after it divested from Navajo (LADWP, Dec 2025). IPP's 840 MW of new units replace 1,800 MW of coal. LADWP says average CO2 emissions fall from 11.2 million to 1.5 million metric tons a year. Coal supplied 11% of LA's energy in 2024 (LADWP IPP page). Hydrogen blending is scheduled to begin in 2026. Whether that has started was not confirmed as of this writing.
  2. LA100 targets. The goals are 80% renewable by 2030 and 100% carbon-free by 2035, ten years ahead of the state's SB 100 2045 goal. The 2027 LA100 Plan cycle began on 13 August 2026 (LA100 deck). Hitting the targets means procuring about 1,065 MW of clean energy a year on average from 2026 to 2035. The 2025 plan found in-basin hydrogen fuel cells not feasible at the scale required.
  3. Storage and demand-side resources. LADWP approved $195 million in 2025 to scale demand response to 340 MW. It plans about $245 million of energy efficiency in FY2026-27, and SCPPA is running a storage RFP. The utility has also built distributed solar-plus-storage projects at the LA Zoo (4 MW / 20 MWh) and Encino Floating Solar (5 MW / 20 MWh). Grid-scale battery capacity is still small, at 21.5 MW utility-owned before Eland.
  4. Grid rebuild. Plans include more than 40 transmission and distribution projects (about $5.4 billion), at least $1.6 billion of distribution upgrades and in-basin conversions such as Tarzana-Olympic 230 kV (LA100 deck; Infrastructure Plan).
  5. Load growth. SCE projects that demand in its territory will nearly double between 2025 and 2045, driven by vehicles, housing and commercial and industrial growth (EIX 10-K). LADWP's August 2026 deck lists data centers as a forecast uncertainty but gives no megawatt figure. Burbank's load forecast includes a data-center category without published numbers.
  6. Risks named in official plans. Wildfire litigation is KBRA's main downgrade risk for LADWP, along with delayed rate recovery. Expiring federal tax credits will push renewable costs up, according to the LA100 deck. Debt is rising: KBRA expects coverage to drift lower as borrowing grows. SCE's S&P outlook is Negative. SCE is hardening named circuits through 2028 and plans 7-day ensemble wind forecasts by November 2026 (SCE PSPS Action Plan).

What residents can do and where to look

  • Outages: LADWP's outage line is 1-800-DIAL-DWP (1-800-342-5397). During the 2024 heat storm LADWP asked customers to call if an outage lasted more than 24 hours (LADWP). SCE customers should use SCE's outage and PSPS notifications. The CPUC publishes SCE's post-event PSPS reports (CPUC).
  • Emergencies: SOS.city is not an emergency service. In an emergency, call 911.
  • Medical needs: SCE is moving to monthly enrollment of Medical Baseline and self-certified customers for PSPS notice, by 31 December 2026 (SCE PSPS Action Plan).
  • Heat: LADWP's Cool LA program held six heat-relief events and gave out more than 1,800 portable air conditioners (Briefing Book).
  • Know your mix: each utility publishes an annual Power Content Label with the CEC (LADWP label page).
  • Follow the money: LADWP budgets go to the City Clerk (FY2026-27 transmittal). Bond disclosures are on EMMA, and SCE's are in Edison International's SEC filings.
  • Have a say in LA100: LADWP runs Advisory Group and public meetings for the 2027 LA100 Plan (LA100 deck).

What we couldn't find (yet)

These are not public, or we did not find them in the sources we opened.

  • SCE in LA County: how many SCE customers are in LA County, and SCE's total customer-account count (not found in the 10-K or annual report sections read).
  • Other municipal utilities: Glendale, Pasadena, Vernon and other city utilities (customers, peaks, mixes, budgets). No sources were opened for them.
  • LADWP ratings and rates: Moody's, S&P and Fitch ratings on LADWP Power System bonds, and a published residential cents/kWh tariff.
  • LADWP's import share of supply, and LADWP's MW shares in Palo Verde, Hoover and IPP. LADWP's share of IPP Renewed output was not stated.
  • Pacific DC Intertie: rating and LADWP share. Not documented in sources opened.
  • Plant ratings: MW ratings for Haynes, Scattergood (current units), Valley, Harbor and Castaic individually. The Briefing Book text did not give them.
  • IPP coal units: whether the IPP coal units still run for other buyers, and whether hydrogen blending at IPP Renewed has begun in 2026.
  • Data centers: LADWP and SCE data-center load forecasts in MW.
  • Balancing: formal confirmation of the balancing-authority arrangements (LADWP and CAISO) from an opened source.
  • Coastal cooling: the current status of the coastal plants' cooling-water arrangements.
  • Next round: our search time ran out during this round of research, so the gaps above are where we start next.

Questions people ask

Who provides electricity in Los Angeles?

Inside the City of Los Angeles, the city-owned LADWP supplies power to about 1.59 million customers. Most of the rest of LA County is served by Southern California Edison (SCE), and cities such as Burbank, Glendale, Pasadena and Vernon run their own utilities.

Where does LADWP's power come from?

LADWP's 2025 Power Content Label shows 45% eligible renewables, 26% natural gas, 15% nuclear, 12% coal and petroleum and 3% large hydro. Coal still appears because Utah's Intermountain coal units supplied LA until late November 2025.

Does Los Angeles still use coal power?

No. LADWP stopped taking coal power from the Intermountain plant in Utah in late November 2025. The 840 MW of new units there run on gas for now and are designed to blend up to 30% green hydrogen.

What is LA100?

LA100 is LADWP's goal of 80% renewable power by 2030 and 100% carbon-free power by 2035, ten years ahead of the state's 2045 goal. LADWP's own modelling projects average retail rates of 44.1 cents/kWh in 2030 and 64.2 cents in 2035 on that path.

Get ready

Our own field guides, written from official guidance. Everything above is free.

The Grid-Down Kit $99.99

An offline library on your own phone and drive, for when the power, the towers or the internet are down.

See the guide

Sources

  1. KBRA, LADWP Power System 2026 Series B rating report (May 2026)
  2. Edison International, Form 10-K FY2025
  3. LADWP, LA100 Advisory Group kickoff deck (Aug 2026)
  4. LADWP News, Coal-free L.A. announcement (4 Dec 2025)
  5. LADWP, Briefing Book 2024-25
  6. LADWP, 2025-26 Power Infrastructure Plan
  7. LADWP, 2017 Power Integrated Resource Plan
  8. Intermountain Power Agency, IPP Renewed
  9. LADWP, 2025 Power Content Label
  10. Burbank Water and Power, budget presentation (6 Mar 2025)
  11. KBRA, LADWP Power System 2025 Series C rating report (Sept 2025)
  12. California Energy Commission, LADWP 2024 Power Content Label
  13. CPUC, letter to SCE on its PSPS program (3 Oct 2025)
  14. LADWP, Power System facts and figures
  15. LADWP News, peak demand archive
  16. California Energy Commission, LADWP 2018 Power Content Label
  17. LADWP, 2022 Power Content Label
  18. California Energy Commission, LADWP 2023 Power Content Label
  19. Edison International, Annual Report FY2025
  20. EIA, California electricity profile 2024
  21. LADWP, preliminary FY2026-27 budget transmittal (13 Feb 2026)
  22. LADWP, Intermountain Power Project page
  23. LADWP News, heat storm update (8 Sept 2024)
  24. LADWP News, heat storm update (9 Sept 2024)
  25. ABC7, heat wave power restoration report (11 Sept 2024)
  26. CAL FIRE, Eaton Fire incident page
  27. McChrystal Group for LA County, after-action review (Sept 2025)
  28. SCE, 2026 PSPS Action Plan
  29. CPUC, SCE 2025 PSPS post-season report (amendment 2)

Get the data behind this report

Public records about places, buildings and services. Not for tenant, employment, credit or insurance screening. Prefer it free? Request it.

Get Los Angeles County alerts and new reports by email

Every public record we hold for Los Angeles County, each linked to its publisher: Los Angeles County in the SOS.city library.

How this report was made

Each report is written from public records: utility filings, government budgets and reviews, regulators and official data. Every figure links to the source that states it, and a second reader checks the figures before a report goes up. Reports describe how systems work and depend on each other, the way official plans do; they never map weak points. First published 7 November 2026. SOS.city is not an emergency service: in an emergency, call 911.